Granite Rip Rap & Shoreline Steps, 52 ft
20 tons of Type I and Type III granite stopped erosion on 52 feet of shoreline, with new shoreline steps built over the stone to the dock.
- 52 ft of shoreline
- 20 tons of granite
- New shoreline steps
Rip Rap & Shoreline Steps
Rip rap and shoreline steps projects that stop erosion and make the bank usable again. We install granite and river rock rip rap and handle Corps of Engineers permitting for our customers.
Select any project to read the full case study.
20 tons of Type I and Type III granite stopped erosion on 52 feet of shoreline, with new shoreline steps built over the stone to the dock.
Both banks flanking the dock, 75 feet on the left and 80 on the right, taken from overgrown, eroding shoreline to graded, armored stone.
Tell us about your shoreline, dock or lift and we'll put together a plan and estimate.