Case Study · Dock Redecking

Lake Oconee Dock Redeck: WearDeck, Edge Bumper & Trim in Greensboro, GA

A returning customer in Greensboro had a dock whose decking had worn and faded. We stripped every old board, laid new WearDeck in Barefoot Sand, wrapped the boat slips in black edge bumper and finished the remaining edges with sandstone aluminum trim.

LocationGreensboro, GA 30642
LakeLake Oconee
ProjectFull dock redeck
DeckingWearDeck, Barefoot Sand
EdgesBumper + aluminum trim
TimelineAbout 2 weeks
Redecked swim platform in Barefoot Sand WearDeck on Lake Oconee in Greensboro, GAEvery board replaced

The short version

Marine Specialties redecked a Lake Oconee dock in Greensboro, GA from end to end. We removed and disposed of all the old decking, installed new 1″ x 6″ WearDeck boards in Barefoot Sand with stainless steel screws, added black soft edge bumper around the boat slips and outside fingers, and finished the remaining edges with sandstone aluminum trim. The dock’s frame, lifts and canopies stayed in place; the surface and edges are all new.

Project Scope

Full Redeck with Edge Bumper & Aluminum Trim

Everything below was part of one project, start to finish.

  • Removal and disposal of all existing decking
  • New 1″ x 6″ WearDeck decking in Barefoot Sand
  • Stainless steel deck screws
  • Walkway, seating platform and boat slip fingers redecked
  • Black 10 ft soft edge bumper around the boat slips
  • Edge bumper along the outside fingers
  • Sandstone aluminum trim on the remaining dock edges
  • Existing frame, boat lifts and canopies left in place
Before & After

Same Platform, New Surface

Worn dock decking on a Lake Oconee platform before redecking in Greensboro, GABefore
The seating platform with its worn, faded decking.
Dock platform redecked in Barefoot Sand WearDeck with seating in Greensboro, GAAfter
The same platform in Barefoot Sand WearDeck.

Tap the photo or use the buttons to switch views.

The Challenge

The decking had worn out, but the rest of the dock was staying. The job was a new surface without disturbing everything around it:

  • Every board, not patches. All of the old decking came off so the new surface would match from end to end.
  • Working around the lifts. The boat and PWC lifts stayed in place, so the crew worked slip by slip around them.
  • Edges that take a hit. The boat slips and outside fingers needed protection where boats and PWCs come and go.
  • A clean finish everywhere else. Edges without bumper needed trim so no raw board ends would show.
By the Numbers

What Went Into This Redeck

100%of the old decking removed and replaced
1″ x 6″WearDeck boards in Barefoot Sand
9crew visits from tear-off to final trim
2 wksstart to finish
3finishes: WearDeck boards, black edge bumper, sandstone trim
0boards left to stain or seal

From the redeck package installed on this project.

Our Solution

The Redeck, Step by Step

One crew handled the project from tear-off to the last piece of trim. Select a step to see it.

Dock walkway with worn decking before redecking on Lake Oconee

Step 1: Where we started

The walkway, seating platform and slip fingers were covered in worn, faded boards. The homeowners chose WearDeck in Barefoot Sand for the new surface.

Dock walkway framing exposed after the old decking was removed on Lake Oconee

Step 2: Tear-off

The crew removed every old board and hauled it away, opening up the dock framing for the new deck.

New WearDeck boards fastened to a dock platform on Lake Oconee

Step 3: New decking

New 1″ x 6″ WearDeck boards went down across the platform, walkway and fingers, fastened with stainless steel screws.

Black soft edge bumper along a boat slip on a WearDeck dock in Greensboro, GA

Step 4: Edge bumper

Black soft edge bumper went around the boat slips and outside fingers, where boats and PWCs meet the dock.

Sandstone aluminum trim along the edge of a WearDeck dock walkway in Greensboro, GA

Step 5: Trim

Sandstone aluminum trim finished the edges without bumper, including the walkway end at the shoreline.

Redecked WearDeck dock walkway leading back to a Lake Oconee home

Step 6: Finished

The whole dock, walkway to slips, now has one continuous Barefoot Sand surface.

1 / 6
Project Photos

More From This Project

Select any photo to see it full size. Use the arrows or swipe to browse.

The Result

  • One continuous surface. Walkway, seating platform and slip fingers all in matching Barefoot Sand WearDeck.
  • Nothing to stain or seal. The new boards replace decking that had faded and worn.
  • Protected slip edges. Soft edge bumper where boats and PWCs come and go.
  • Finished edges everywhere else. Sandstone aluminum trim, with no raw board ends showing.

Thinking about a new surface for your dock? See our dock remodeling and redecking services and Lake Oconee dock services, read our Lake Lanier redecking case study, or browse more finished work on our project map.

Questions We Hear

Dock Redecking FAQ

Can you redeck a dock without replacing the frame?

Yes, when the frame is in good shape. On this Greensboro dock we replaced the decking, bumper and trim, while the frame, boat lifts and canopies stayed in place.

How long does a dock redeck take?

This one ran from tear-off on October 20 to final trim on November 3, across 9 crew visits. Timing for your dock depends on its size, its layout and the decking you choose.

What does edge bumper do?

Soft edge bumper lines the boat slips and outside fingers so boats and PWCs touch a cushioned edge instead of hard decking. On this dock we used black 10 ft soft bumper sections.

Can I choose the decking color?

Yes. Color was the homeowners’ choice on this project, and they went with WearDeck in Barefoot Sand.

Ready for a New Deck?

Get a Free Dock Redeck Estimate on Lake Oconee

Tell us about your dock and what’s wearing out. Our Eatonton office serves Lake Oconee and Lake Sinclair.

  • Marine construction since 1988
  • Licensed & insured
  • Old decking removed for you